Collapses the entire docs/backend/ set - Phase 1-10, Track A/S, the
partner API, the two handoffs, the frontend surface inventory, and the
harvest requirements - into a single source of truth,
docs/backend/BACKEND-INTEGRATION.md.
Every contract's entities, endpoints, and invariants are preserved,
reorganised by domain rather than by sprint. The nine release
invariants, the FH-* harvest mechanisms, the RBAC/audit/secrets
cross-cutting rules, the tenant-routing infra contract, the 15
acceptance tests, build order, dev setup, and open decisions are all in
the one file, with a change log (§14) at the bottom.
The file opens with the maintenance rule: any new backend need, contract
change, or shipped item updates this file in the same change - the
affected section and the change log. No new backend .md files.
Inbound links from BACKEND-API-REFERENCE, the ADRs, the fork docs,
DEPLOYMENT, PACKAGES-USAGE, the delivery plan, and e2e/README are
repointed at the single doc (section anchors collapse to the file; the
prose section refs remain as context). Also recorded the rule in the
repo CLAUDE.md.
17 backend docs removed, 1 added. No implementation changes.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>
A partner integration request landed for programmatic merchant-hierarchy
management (Company/Project/Store/PaymentPoint). Built the answer generically:
partner-specific behaviour is a PartnerProfile config row, and no partner name
appears in any entity, field, endpoint or status value.
New:
- docs/backend/PARTNER-PROVISIONING-API-CONTRACT.md - hierarchy, idempotency,
node-scoped public-key credentials, TEST/LIVE partition, routing context
- docs/context/adrs/ADR-0003-generic-partner-provisioning-api.md
Amended, because the schema impact must land before Phase 1 is implemented:
- Phase 1 gains RoutingContext on CheckoutSession/PaymentIntent/Payment,
frozen at checkout-session creation and immutable after
- Phase 7 gains routing on Refund/ReconciliationRecord, plus the rule that
seller settlement splits happen after routing, never as a hierarchy level
- Phase 9 gains Company/Project above Marketplace and PaymentPoint below it,
with a backfill sequence for existing marketplaces
- Track S gains partner credentials: public key only, node-scoped authority,
rotation with overlap, immediate revoke, audit coverage
Also: Track P (P1-P10) in the delivery plan, and backend ownership closed as
answered across the contract set.
Card payment was checked, not added - qr and card both already ship in
cart.component.ts with separate create paths and status pollers.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>