# Next Phase — Post-Backend-Integration Work Everything here assumes a real backend implementing `docs/BACKEND_INTEGRATION.md` exists. None of this can start before that. Not a re-statement of the backend checklist itself (`BACKEND_INTEGRATION.md` §9 owns that) — this is what the frontend needs to do once a real API is reachable. ## Connect gateways Swap every mock gateway for a real one behind its existing (or newly-added) DI token, per the migration checklist in `BACKEND_INTEGRATION.md` §8. Order matters — follow §8's dependency-ordered sequence (auth/tenant/bootstrap first, then read-heavy catalog domains, then write-heavy customer domains, then admin domains, then builder/CMS). ## Remove mocks Once every domain has a real gateway bound and verified, retire the `*LocalGateway`/mock repository implementations (or gate them behind an explicit dev-only flag if they're still useful for offline frontend development). Remove `useMockData`/mock-interceptor paths that are no longer reachable. ## Wire dormant auth Register the Ed25519 `authInterceptor` in `app.config.ts` and attach `ed25519AuthGuard` to admin routes once a real backend can issue/verify challenges — currently fully built but not activated. Fix the `toAuthErrorShape()` gap noted in `KNOWN-ISSUES.md` so `session-expired`/`invalid-signature` screens become reachable once the backend returns a body-level error code. ## Enforce the role model Wire the existing (currently unenforced) `AdminRole` model into route guards and UI gates — right now anyone who passes admin auth has full access regardless of role. ## Integration testing No automated test suite exists yet for any of the touched areas. Once real endpoints exist, this is the point to add integration tests against them (not against mocks) — facade-level tests verifying real request/response shapes match `BACKEND_INTEGRATION.md`. ## E2E tests Critical flows worth covering first: storefront checkout (cart → order → payment), admin product/category CRUD, builder draft → publish → live storefront reflects the change, admin auth (once Ed25519 is live). ## Performance profiling Real backend latency will differ from the instant mock responses today — re-profile loading states, skeleton timing, and the two known large lazy chunks (`project-editor`, `catalog-container`) under real network conditions before committing to a bundle-splitting approach. ## Production monitoring Wire real error tracking/APM once real endpoints exist — the current admin Monitoring page is mock activity data with no real event source. Decide on the actual monitoring/observability stack as part of backend infra (out of frontend scope, but the frontend's Monitoring UI is ready to display real events once real events exist — see `BACKEND_INTEGRATION.md` §3 Monitoring). ## Maintenance mode Build the frontend UI gaps explicitly flagged as not existing yet in `docs/MAINTENANCE_MODE.md` (full-page maintenance takeover, per-module inline banners, scheduled-maintenance countdown) once the backend maintenance-mode contract (also in that doc) is decided and implemented.